G4 Pack, Part 5: First stitches

I finally worked up the courage to begin assembling the pack, beginning with the straps, as per the instructions.  I didn’t get very far–only put the thumb and tube loops on the strap linings.  Baby steps, baby steps.

The straps coming along

Mostly I’ve just been fiddling with the sewing machine.  I was having some trouble with the ripstop, as the stitches were not uniform.  I assume this is caused either by slipping or sticking of the fabric, probably the latter as the stitches sometimes appear to be smaller than they should be.

I read somewhere that a walking foot or teflon foot would help.  A walking foot at John Lewis was £40, but the person helping me suggested that I just put some tissue paper underneath, so I might give that a shot.  The cordura seems to go through the machine without a problem, though.

This entry was posted in G4 Pack, Projects and tagged , . Bookmark the permalink. Post a comment or leave a trackback: Trackback URL.

Post a Comment

Your email is never published nor shared. Required fields are marked *

*
*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>

  • Current Projects

    AV2 Frameless Backpack:

    • Finished!
    • Time Spent: Not sure, probably around 20 hours
    • Total weight: ~16 oz.

    SXSW 2011 Songs

    • Total Songs: 1154
    • Songs heard: 1154
    • Percent complete: 100%
    • Songs kept: 184
    • Percent kept: 16%

    as of June 26th, 2011