From Cambridge University Caving Club - CUCC wiki
Jump to: navigation, search
(Create page)
 
(Add link)
Line 1: Line 1:
 
= New Biertent tarp =
 
= New Biertent tarp =
  
Frank Tully measured the biertent in 2015 in order to get a new cover made. He acquired a PVC welder and some material for 2016 but time/weather prevented construction.
+
Frank Tully [[http://expo.survex.com/years/2015/biertent.html|measured the biertent in 2015]] in order to get a new cover made. He acquired a PVC welder and some material for 2016 but time/weather prevented construction.
  
He is coming in 2018 and hopefully we'll get it done this time.
+
Another attempt will be made in week1 2018. Hopefully we'll get it done this time.

Revision as of 20:26, 16 May 2018

New Biertent tarp

Frank Tully [the biertent in 2015] in order to get a new cover made. He acquired a PVC welder and some material for 2016 but time/weather prevented construction.

Another attempt will be made in week1 2018. Hopefully we'll get it done this time.